O.P. Event Viewer Date
Is there a way, in the Event Viewer, to have a Date (beside the time), and sort and filter events using Date?
The way it is right now (and correct me if I am wrong), the events are all mixed and you have no idea when they actually happened (they have time only), since they don't have a date reference.
This post was edited on 01-24-2007 at 04:59 PM by WDZ.
|