quote:
Originally posted by KeyStorm
There is no special requirement about time disposal. Groups can be managesper mail or using this board, soi it doesn't require a constantly simultaneous work.
The real problem, KeyStorm, is the synchronism and necessary commitment to maintain the group working. I travel a lot because of my work. It can happen, e.g. of the group to need of a translation that was under my responsibility with urgency and I to delay an entire work for me to be absent. Do you understand me?